[PLUG-TALK] Remodelling Re: Nursing Re: ...

Ted Mittelstaedt tedm at portlandia-it.com
Wed Sep 25 03:44:53 UTC 2024


Of course that's a remodel.  Legally you didn't have to replace all the
wiring but doing so was obviously the smart thing.  The drywall work alone
must have really sucked.

Incidentally StabLoc is a Federal Pacific panel, StabLoc was just a trade
name.

https://homeinspectioninsider.com/federal-pacific-panel/

My parents have one of these panels.  I alerted them 15 years ago and told
them to replace it.  My father denied the issue for years.  Finally after an
electrician did some work on the house he asked him and the electrician told
him to replace the panel.   And he was going to.  Then my mother was
convinced by my uncle a retired engineer that she didn't need to do it and
so they nixed the project.  I was furious.

I'm executor on the estate.   Over the years, costs to replace have
skyrocketed as ever increasing electrical code requirements have come into
play.  They no longer manufacture in-between-stud panels because the newer
panels need wider space for new smart breakers.  And more and more home
insurance companies are refusing to write fire insurance on homes with these
panels.

Once both of them pass and the house is cleaned out, I'm estimating at least
$20k for a replacement job.  It would have been no more than $2k if they had
replaced the damn panel when I told them to.   And I'm sure my siblings will
screech about it.

It really sucks when you have to spend all this money on something new and
then you don't get to enjoy the benefits of it.

Incidentally there are other panels over the years that have had problems.
Murry with the fire engine red main breakers, the main breakers can get
loose and arc holes in the bus bars.  Zinco panels are another one that's
bad.  But for sure, FPE took the cake.  And the article I linked above
doesn't even scratch the surface of the crap that FPE pulled behind the
scenes to delay the day of reckoning and get out of liability for
housefires.

Ted

-----Original Message-----
From: Keith Lofstrom <keithl at keithl.com> 
Sent: Sunday, September 22, 2024 11:23 PM
To: Ted Mittelstaedt <tedm at portlandia-it.com>
Cc: 'Off-topic and potentially flammable discussion'
<plug-talk at lists.pdxlinux.org>
Subject: Remodelling Re: [PLUG-TALK] Nursing Re: ...

On Sun, Sep 22, 2024 at 01:06:18PM -0700, Ted Mittelstaedt wrote:
> Unless they fundamentally change building codes the way it's always 
> worked is that the codes that the house must meet are the ones that 
> were in force when the house was built.
> you wish.  This is for repairs - not remodels.
> 
> If you are doing a remodel you have to meet current codes.

The 1960 house we purchased and moved into had two prong outlets in most
rooms, and a StabLok circuit breaker box in the basement.  StabLok is
insanely dangerous; our electrician called them "the arc welder of load
centers".
StabLok was sued into bankruptcy; the company that bought their assets was
sued into bankruptcy.  Hence, an electrical remodel was essential, so we
could have fire insurance, rather than electrical fires.

With a load center "remodel" unavoidable, I spent two months remodelling the
entire electrical system, and everything it touched.  A sub-panel for
generator inlet power (still haven't bought the 5 KW generator that it
enables, just a 1KW baby Honda), modern grounded outlets, GFCI where it
helps, attic lights, etc. 
The biggest change was two enormous medical grade isolation transformers,
one for my computers, one for my electrical engineering work benches.

Two CAT6 connectors in every room.  I still haven't gotten around to adding
a Personal Telco wifi AP.

I paid a professional electrician to install a new Eaton load center, and to
inspect all my work before the county inspector did ($800 to Washington
County
for 5 minutes of cursory "inspection").   I learned why
I should have bought the 2010 electrical code book, rather than rely on the
2008 code in Beaverton Library.

That professional is retired.  Fortunately, during the Benson High School
open house a week ago, I met a "basic electric circuits" teacher who has an
electrician's license, and also does pre-inspections.  I can hunt for the
notebook with his name if anyone wants it.  

-----

Plumbing next.  Old iron pipes have weep spots.  I will probably "remodel"
the plumbing as well, separating gray water from septic water, using the
grey water for grass and decorative gardens.

We already have reverse osmosis filters for drinking water.

After that, move from natural gas to heat pump.  After that, emergency
generator and a large propane tank, for two weeks of winter emergency power.
All these major improvements seem like "remodels".

Keith L.

-- 
Keith Lofstrom          keithl at keithl.com



More information about the PLUG-talk mailing list